366394-200

IMPROVE-STABILIZE VOLTAGE

Improves and stabilizes the voltage supplied to the load.

134457-200

BALANCE CURRENT

Real-time reduction of phase current, and balancing of load current over the three phases.

732187-200

FILTER SURGES-TRANSIENTS

Shields against an infinite number of surges, transients, and spikes.

139855-200

MITIGATE HARMONICS

Mitigates broadband harmonics,through tuning and/or de-tuning.

330617-200

IMPROVE POWER FACTOR TO %100

Optimizes system power factor to a nominal 95% – 100%.

578135-200

REDUCE LOSSES & SAVE KW-KWH

Effectively reduces all types of losses.

731756-200

PROTECT AGAINTS BROWNOUT

Maintains and increases voltage in real-time,even by as much as +/-20%.

167879-200

PREVENTY SUPPLY FAILURE

Supplies continuous voltage during intermittent supply failure and line switching.

577852-200

MITIGATE SPECIFIC HARMONICS

Mitigates specific and/or multiple harmonics of any magnitude to a non-destructive level.

80567-200

SYNTHESIZE LOST PHASE

Detect and synthesize the lost phase continuously and indefinitely, maintaining the supply of power.

PRESENTATION AND AUDIT

We visit your facility to present the system in detail and offer you FREE electrical efficiency measurement in place, called audit.

REPORT AND PROPOSAL

According to audit analyses, we prepare a detailed report of your facility including; voltage inefficiencies, exact saving ratios that ES can provide and payback periods of your investment in a proposal format.

LINK AND DESIGN

Once you confirm the proposal, we revisit you in place and make another detailed measurement called Link Analyses. According to the outcome of the “link”, we design the integration of ES system that just fits perfect for you.

PRODUCTION AND INSTALLATIONS

Following the design phase, we produce the right system for you shortly. Then, we visit and install the system to your electrical system all the way through the transformers to electricity distribution panels. Now, you are ready to save up to 30% over your electricity bills in addition to lower maintenance costs for your busıness.

Eten Systems saving performance & recommendation dor additional unit at Hitachi electronic plant. Thank you for the good performance product and keep up the great work.

Zolkapali b. Talin. / Senior Executive: Industrial Engineering Section

Power quality: our experince with Eten Systems in this area is satisfactory. Eten Systems has definitely improved the quality of power that we now receive in the factory, to the extent that we no longer experience surges and transients in the outlet power.

Suhas Patil / Team Leader: Bidco Oil Refineries LTD

Due to the improvement of power supply through the installation of Eten Systems, we have saved upto 25% in our power bil.. Which is a large cost factor in our production cost.

K.T. Joseph Shelly / Group Accounts Manager: Enkasiti Flower Growers LTD

Propnet would like to express our appreciation to Iskhus for the Eten Systems installed at the Carlton Centre. The solution that was installed addresses our needs and produces a result that exceeds your intial estimates. In addition, we are pleased about the professional service received from your staff during the project.

William Bright / Electrical Engineer: Propnet

We are satisfied with the performance of the Eten Systems Tecnology and we wish to recommend it to whoever may prefer to improve on the electrical power quality within their establishment and facility.

P. J. Mutoni - E.M. Twininge / Estate Management Department Directorate Of Personel And Administration: Bank Of Tanzania

Due to the contribution of the Eten Systems to the more efficient consumption of the energy, the TOBB Twin Towers Service Building hepls to reduce the carbon emission occurring in the production lines and thus contributes to the sustainable and green environment.

M. Rıfat Hisarcıklıoğlu / President

We would like to thank you for the great job you and your staff performed in the implementation of the Eten Systems in all our six airports throughout the country and your contiuned corporation on the same.

Eng. M. Mukwana / Project Manager

For More Information Contact Us